Archives

So much done!

Oh my goodness have I accomplished a lot lately!  Today was the guild sew-in, only 2 people besides me showed!  I finished the blocks for The Quilt Show 2010 BOM and started working on the borders.  I got the first set done, I have 136 half square triangles to put together for the next set of borders.  Probably won’t get to that yet, but it’s next on the agenda!

December Star Crazy Blocks

Remember last year when I said I was going to start hand piecing a quilt?  Well, since I want to use the 2.5″ squares on the hexagon quilt I decided to just machine piece everything I had done and see how big it was going to turn out.  It’s kinda on the small side unfortunately (only 20″ x 36″) , I’m thinking I might put some borders on it and have it in the car for Alex.  We’ll see what I decide to do with it, it won’t be anytime soon!  I might just decide to start making more blocks and make it bigger, I do like how it looks.

hand piecing project

My die from Accuquilt shipped last week and should be here Monday, so I will be able to cut up the whites I bought last week and the fat quarters I pulled from the stash.  I’m really happy with how it looks so far, I did a mock-up in EQ and right now it’s designed at 37″ x 43″.  I’m not sure how big I want to make this, so for now that’s where I’m headed as a starting point.  I need 39 whole flowers and 10 half flowers for the top and bottom, right now I’ve got 15 whole flowers completed.  It looks dark in the picture but’s it really not that dark.  I bought some plastic templates at Joann’s last week and have started using them.  I haven’t decided if I like the heavier weight paper or the templates yet.  They are a lot thicker than the paper, I’ll have to see if there’s a difference when it’s sewed together and the templates are removed.

Hexagon Quilt 02-18-12

Never got up to the frame the other day, I still need to finish removing the red tacks from the backing so I can get working on re-tacking it, I want it off that frame!!!  Now that I have my MacBook pretty much setup the way I want with music, I’m hoping I can work on it tomorrow since I’ll have music to listen to while Alex sleeps!

*sigh*

I know, I know….it’s been AGES since I’ve posted anything. This 15 month old little boy takes up all my time! :) I can’t believe how quickly time has passed. He’s 15 months old, walking (and running) and so damn cute it kills me! And smart too! Ok, you didn’t come here for me to gush about my little one, did you?

I’ve been doing some cross stitch, haven’t finished anything since Halloween though. I made this little wall hanging just in time to put up for our Halloween party. You can’t tell in the picture, but some of the thread glows in the dark, boy was that a pain to stitch with!

Trick or Treat Wallhanging

I haven’t really worked on my hand piecing project lately. I was working on cross stitch and just put that away recently to work on Dear Jane applique blocks. I was talking with some of the ladies at guild and they reminded me that I need to make time to work on my sewing – it’s been MONTHS since I turned it on! In fact I just cleaned it off a week ago! Mended a shirt for Alex that has been sitting here for ages and now it’s ready to work on some quilts! So I’ve decided to start working on Dear Jane again. Finished 2 blocks in the past few weeks and I’ve got another almost done, in fact it should be done tonight since there’s a basketball game to watch!

J-11


JS09

Saturday the guild is doing a sew-in from 12-4 and I’m thinking that I’m going to go. I really want to sew and this would allow me to do nothing but that! I think that hubby can take care of Alex for 4 hours, especially since he’ll most likely be napping for half of that. So I’m planning on working on Star Crazy. I’m going to get as much prepped as I can before Saturday, I’m hoping I can get the top put together in 4 hours. Heck I’ve already got the center done!

And just because I love posting pictures of my son….

Alex - January 2012

Sewing Update

Well, I really wanted to keep working on the Quilt Show 2010 BOM, but I decided I needed to spend the time yesterday working on some terry cloth bibs and burp cloths for my son. I had bought white and pink terry cloth a few years ago intending to make bibs for my cousin’s baby. At the time I was going through a miscarriage and just couldn’t make anything baby related. So these 2 yards of terry cloth have just been sitting. We have now gone through all the small bibs that we were given because my wonderful son just got too big and drools so much they just don’t hold it all! And I’m still trying to understand why companies make burp cloths that don’t cover your shoulder all the way, because this kid loves to spit up on mommy!

I’ve made 2 bibs so far, and I have enough white left to make at least 4-5 more when I get time. I used up all the pink for burp cloths since my husband doesn’t mind if Alex spits up on pink, he’s just not allowed to wear it! Hopefully I’ll be able to get some of my own sewing done soon!!

Bibs and burp cloths

November Blocks!

Oh my goodness I finally finished my November blocks! Took me awhile to get all the pieces cut out, but I’ve finally figure out how to make the most of Alex’s nap time! As long as my household stuff is done (try and do the night before after he goes to bed) I can work on sewing during his naps. With chain piecing, I flew through the half Irish chains, but I noticed my cutting wasn’t always as precise as I though it was. You’d think after almost cutting this entire quilt out, I’d be better at it, but I guess I have more room to grow! I also noticed that we cut a few more white pieces than we needed, not sure why, but I know I have 1 full Irish chain block and 12 half blocks, which is what we are supposed to have! On to December’s blocks!

November blocks

Alex :)

October Blocks – FINALLY!

Well, it took me almost 2 months, but I finally finished my October blocks. The first 2 weeks in October I cut out all my pieces, but due to the fact that I was 9 months pregnant I couldn’t really get to the sewing machine. My little boy was born October 14 (10 lbs even and 21 inches long) and I couldn’t have asked for a more perfect child! Trying to get into a schedule of some sort took time, and this was the first time I have been able to actually sit at my sewing machine in 2 months! Took me 2 days to get everything together, I had to fit it in with his feeding schedule. I am hoping to get November’s pieces cut out tomorrow, as my husband is still home from work and can keep an eye on him.

I haven’t been to guild in 2 months and I’m looking forward to going in December. Alex will be going with me, I think the ladies would kill me if I didn’t bring him!

September Star Crazy BOM

I finally got my September blocks completed after working on them for about a week. It’s hard to sit for long periods of time at the sewing machine when you are 8 months pregnant! I’m really liking how the colors are turning out in the different blocks, I can’t wait to see what it looks like all put together!

I have some other projects that have been finished, I’ll post about them very soon!!!

September Blocks

August Blocks

Well, it took me a few days to get them all cut out, pieced and ironed, but I did finish putting my blocks together! They seem to be easier to put together, but I really want to start putting the top together! We have to have enough pieces by now to start putting it together! *sigh* Oh well. I know I’ll be able to finish September’s blocks, but I don’t know if I’ll be on time with the rest of the year. The baby is due in October and I just might not be able to get to them. We’ll see what I can manage!

July Blocks

Took me a couple of days in between other projects, but I got all the July blocks completed. I’m really liking the way the colors are playing together. I can’t wait to start putting all the blocks together! From the looks of it, we don’t do that until December though!

June blocks & a Finish

I finished the June blocks pretty quickly. I cut everything out before vacation, and even got the Irish Chain block completed. All I needed to do today was put the 2 stars together. I can’t wait to start putting the top together, this is going to look so cool when it’s done!

I was also able to quilt and bind the 2009 Quilt Show BOM. However, since I never finished it (only completed month 1) I decided to make it into a table topper. Then I changed my mind and put a sleeve on it so I can hang it in my half bath that has a red, white and blue theme. It was something easy to work on during the flight to Florida. Another finish for the year!!!

May Blocks

I completed my May blocks fairly early this month, there’s still more than a week left in the month! :) Hard to believe I’ve been keeping up with this, I didn’t really get too far on last years BOM!

May Blocks